March 2025:
completed items
New friendly signs upon the entrance and in additional areas were installed | Swapped out for all new LED lights (5) in community pool |
Began additional lake treatments including cutting the bullrush | Painted all the mailbox posts and mailboxes (pending: 3 new posts and replacing bad or missing flags) |
Fixed the majority of broken keycard readers at gates around the pool, splash park and tennis court | North irrigation pump installed sometime by Sullivan; fixed issues tied to South pump also! |
2 new cantilever umbrellas by pool (to be installed 4/12) |
In progress items
Resurfacing clubhouse pool & spa with Living Waters; project date to start around April 21 2025; pool and spa to be closed for about 5 weeks. Target completion date: May 23. | Playground (Clubhouse) repairs including new paint and shade structures. Also replacing mulch with new rubber mulch; Expected to be complete by early-to-mid May |
Adding new annuals in late April / early May | Sidewalk milling (uneven in common areas + personal homes); avoid tripping hazards |
Landscape permanent soffit channel LED lights (security/holiday) with Outdoor Lighting that uses Gemstone products. For clubhouse, guard house, monuments, main entrance, etc. | Pressure washing of wall on Island Way |
NEW FURNITURE: Clubhouse couch & chairs + some new outdoor pieces including tables; expected to be completed by May | Exploring a pre-certified used golf cart for property management company on site; need electricity setup |
Roof and soffit repair (another) at clubhouse |
February 2025:
completed items
Splash park (kids 11 and under) repaired and functional | Deep cleaned the tile in our clubhouse (and bathrooms) along with painting & sealing the grout |
Pressure washing completed of our sidewalks and walkways including all of Island Way (owned by Rialto) | Repaired clubhouse roof (40 tiles) |
“RIALTO” entrance lettering (signs) and the stone wall was freshly painted (2 in north and 2 in south) | Community wood benches were sanded and stained |
Removal of rust & yellowing found on signs and structures throughout the community; painted FPL boxes and more | Tree trimming by Only Trees throughout the community |
Purchased Zoom license for future board meetings | Passed a new BOD policy on clubhouse office key usage |
Picked new landscaper to begin in April (finalizing contract) | NEW: Tetherball installed by clubhouse pool |
January 2025 completed items
- Mulching of community
- Flowers/plants were installed in Urns
- Giant Bullrush in lakes was trimmed at the end of December.
- Painting of the entrance structures at both North and South entrances
- Internet (public WiFi) fixed so residents can now use it again at or around the clubhouse
- Several gate hinges around pool were replaced and/or repaired
——————————–
November Completed Items
- TOJ roadwork impacting the North (main) Entrance and Exit has been completed. Traffic has resumed back to normal.
- Painting of the entrance structures at both North and South entrances have been completed.
- New light fixtures have been replaced at the North and South entrances and clubhouse.
- Royal Palm has been replaced by South entrance.
- Winter Flowers have been installed.
——————————–
OCTOBER 2024
Completed Items
- Replaced Barcode Scanner at South Gate.
- Repaired stamped concrete at the Main Entrance.
- Added sod to close tree rings
- Fixed parking lot light by tennis court
- Replaced Reflectors on vehicular gates.
- Replaced the pump for the spa.
——————————–
SEPTEMBER 2024
Completed Items
- Launched MailChimp Email and Text Messaging services.
- Fixed Pool Pump for the Splashpad.
- Repaired HOA Golf Cart and Planning for Replacement.
- Repainted Fire Hydrants.
- Replaced Bar Scanner Enclosure at South Entrance.
- Fountain Lights Replaced.
- Landscape Survey Conducted and held High Level Meeting with Annco to discuss results.
- Located and Repaired Water Leak.