RIALTO COMMUNITY PROJECTS

February 2025:
completed items

Splash park (kids 11 and under) repaired and functionalDeep cleaned the tile in our clubhouse (and bathrooms) along with painting & sealing the grout
Pressure washing completed of our sidewalks and walkways including all of Island Way (owned by Rialto)Repaired clubhouse roof (40 tiles)
“RIALTO” entrance lettering (signs) and the stone wall was freshly painted (2 in north and 2 in south) Community wood benches were sanded and stained
Removal of rust & yellowing found on signs and structures throughout the community; painted FPL boxes and moreTree trimming by Only Trees throughout the community
Purchased Zoom license for future board meetingsPassed a new BOD policy on clubhouse office key usage
Picked new landscaper to begin in April (finalizing contract)NEW: Tetherball installed by clubhouse pool

In progress items

Resurfacing clubhouse pool & spa with Living Waters; project date TBD (~April 2025)Purchasing new friendly signs upon the entrance (more welcoming than just the “NO XYZ”)
Adding LED lights (5) in community poolAdding additional lake treatments (2x/mo) for 6 months straight during hottest months to control growth
Replacing or repairing mailbox posts; painting posts; getting some new boxes as well Playground (Clubhouse) repairs including new paint and shade structures
Adding new fence barrier to prevent access to pool area without keycardFixing broken keycard readers at gates around the pool, splash park and tennis court
North irrigation pump has been ordered and will be installed sometime in March; awaiting part by the company, Sullivan Sidewalk milling (uneven in common areas + personal homes); avoid tripping hazards
Exploring a pre-certified used golf cart for property management company on site; need electricity setupNEW FURNITURE: Clubhouse couch & chairs + some new outdoor pieces including tables cantilever umbrellas; expected to review options at the end of March 2025
Holiday light strategy for December 2025 — and beyondFlowers –Spring flowers to be installed in April/May

January 2025 completed items

  • Mulching of community
  • Flowers/plants were installed in Urns
  • Giant Bullrush in lakes was trimmed at the end of December.
  • Painting of the entrance structures at both North and South entrances
  • Internet (public WiFi) fixed so residents can now use it again at or around the clubhouse
  • Several gate hinges around pool were replaced and/or repaired

——————————–

November Completed Items

  • TOJ roadwork impacting the North (main) Entrance and Exit has been completed.  Traffic has resumed back to normal. 
  • Painting of the entrance structures at both North and South entrances have been completed.
  • New light fixtures have been replaced at the North and South entrances and clubhouse.
  • Royal Palm has been replaced by South entrance.  
  • Winter Flowers have been installed.

——————————–

OCTOBER 2024

Completed Items

  • Replaced Barcode Scanner at South Gate.
  • Repaired stamped concrete at the Main Entrance.
  • Added sod to close tree rings
  • Fixed parking lot light by tennis court
  • Replaced Reflectors on vehicular gates.
  • Replaced the pump for the spa.

——————————–

SEPTEMBER 2024

Completed Items

  • Launched MailChimp Email and Text Messaging services.
  • Fixed Pool Pump for the Splashpad.
  • Repaired HOA Golf Cart and Planning for Replacement.
  • Repainted Fire Hydrants.
  • Replaced Bar Scanner Enclosure at South Entrance.
  • Fountain Lights Replaced.
  • Landscape Survey Conducted and held High Level Meeting with Annco to discuss results.
  • Located and Repaired Water Leak.