RIALTO COMMUNITY PROJECTS

SEPTEMBER 2024

Completed Items*

  • Launched MailChimp Email and Text Messaging services.
  • Fixed Pool Pump for the Splashpad.
  • Repaired HOA Golf Cart and Planning for Replacement.
  • Repainted Fire Hydrants.
  • Replaced Bar Scanner Enclosure at South Entrance.
  • Fountain Lights Replaced.
  • Landscape Survey Conducted and held High Level Meeting with Annco to discuss results.
  • Located and Repaired Water Leak.

In-Progress Items*

  • Working with Vendor to Clear Overgrowth in Lakes, including Trimming Giant Bullrush.
  • Addition of Sod to close Tree Rings.
  • Re-Painting of all six (6) Structures at both Entrances.
  • Pressure Washing of common areas.
  • Installation of Winter Flowers.
  • Replacement of Lights at the Clubhouse and both Entrances.
  • Replacement of Pump for the Spa.
  • Repair of Stamped Concrete at the Main Entrance.
  • Working with Electrician to install new Conduit for Parking Lot Light.
  • Replacing Royal Palm.
  • Replacing Hinges on Gates so they Close Properly.
  • Replacing Reflectors on Vehicular Gates.
  • Fixing Loose/Broken Tiles in the Pool.
  • Ensuring Compliance with New HOA laws.